(status: Dec/18)
Ferreira Gomes Energia S.A. (proponent), Foz do Rio Claro Energia S.A. (cooperated), Ijuí Energia S.A. (cooperated), Transmissora Matogrossense de Energia S.A. – TME (cooperated), Empresa de Transmissão de Energia Elétrica do Mato Grosso S.A. – ETEM (cooperated), Empresa de Transmissão do Espirito Santo S.A. – ETES (cooperated) and Empresa de Transmissão de Várzea Grande S.A. – ETVG (coooperated)
- ANEEL Code: PD-07469-0002/2018
- Title: “Development of expert system for predictive maintenance management with simulation of asset management policies based on reliability and financial impact analysis models”;
- Estimated conclusion: April/2020
- Description: Develop a HPP asset management system that addresses all stages of the life cycle (creation, use, maintenance and replacement) using simulation models for better return and lower risk policy.
- Estimated investment: R$ 2,215,128.02, being R$ 674.5 thousand for FGE, R$ 739.4 thousand for FOZ, R$ 561.3 thousand for IJUÍ, R$ 40.0 thousand for ETEM, R$ 140.0 thousand for TME, R$ 35.0 thousand for ETES and R$ 25.0 tohusand for ETVG;
- Implementing Research Organization: ENERGYSERV Serviços em Energia LTDA; Instituto Associação de Empresas Proprietárias de Infraestrutura e de Sistemas Privados de Telecomunicações – IAPTEL; IN FORMA Software S.A. and Genus Energia.
Ferreira Gomes Energia S.A. (cooperated), Foz do Rio Claro Energia S.A. (cooperated), Ijuí Energia S.A. (cooperated), Transmissora Matogrossense de Energia S.A. – TME (proponent), Empresa de Transmissão do Espirito Santo S.A. – ETES (cooperated) and Empresa de Transmissão de Várzea Grande S.A. – ETVG (cooperated)
- ANEEL Code: PD-07217-0003/2018
- Title: “Robust coordination of wind farm overcurrent protection via multicriteria optimization”;
- Estimated conclusion: June/2020
- Description: Multiobjective optimization software, integrated into the utility’s legacy system environment, for planning and coordinating wind farm overcurrent protection to ensure agility, reliability and robustness of the protection system.
- Estimated investment: R$ 2,644,661.94, being R$ 667.2 thousand for FGE, R$ 256.3 thousand for FOZ, R$ 195.13 thousand for IJUÍ, R$ 973.4 thousand for TME, R$ 451.5 thousand for ETES and R$ 101.2 mil for ETVG;
- Implementing Research Organization: Universidade Federal de Minas Gerais – UFMG; Axxiom Soluções Tecnológicas S.A. and Genus Energia.
Transmissora Matogrossense de Energia S.A. – TME (proponent), Empresa de Transmissão de Energia Elétrica do Mato Grosso S.A. – ETEM (cooperated), Empresa de Transmissão do Espirito Santo S.A. – ETES (cooperated) and Empresa de Transmissão de Várzea Grande S.A. – ETVG (coooperated)
- ANEEL Code: PD-07217-0004/2018
- Title: “Performance Improvement of Lightning Transmission Lines through Optimal Lightning Allocation via ATP Coupled Optimization Algorithms”;
- Estimated conclusion: June/2020
- Description: Multicriteria methodology for improving lightning performance of Transmission Lines via optimum lightning arrester allocation, which will be incorporated into a user-friendly interface software with options to maximize ALUPAR LT performance and meet prescribed shutdown rates by ANEEL.
- Estimated investment: R$ 757,385.29, being R$ 392.4 thousand for ETEM, R$ 118,1 thousand for TME, R$ 200.5 thousand for ETES and R$ 46.4 thousand for ETVG;
- Implementing Research Organization: Universidade Federal de Minas Gerais – UFMG and Genus Energia.